PRC Team Members
- Steve Risk, Project Executive
- John Beers, Project Manager
The project consists of renovating a former 3,670 SF lunch room into new locker rooms, showers and faculty office space as well as building a two-story, 34,250 SF addition. This expansion provides an additional eight classrooms, a biology lab, utility lab, art room and a new lunch room. The focal point of the addition is the new library, which was designed with a reading area on the lower level. The ceiling above the reading area is two stories high and includes two large brass chandeliers. A custom built intercommunicating wood stair was built to access the upper level of the library, which overlooks the lower level reading area.
Architect
Tom Dever
Square Footage
38,000
Duration
1 year